Thanks to @imprintsignsltd for doing a great job. Can’t wait to have the rest of the vehicles redone.

Thanks to @imprintsignsltd for doing a great job. Can’t wait to have the rest of the vehicles redone.

0 Comments
A Coir roll revetment on hardwood faggots with backfill and some spot planting installed by some of the guys this week for a client in Frensham, Surrey.
Riverbank with coir rolls

A Coir roll revetment on hardwood faggots with backfill and some spot planting installed by some of the guys this week for a client in Frensham, Surrey.

A Coir roll revetment on hardwood faggots with backfill and some spot planting installed by some of the guys this week for a client in Frensham, Surrey.

0 Comments

Parade Pond Watford – full pond and filtration refurbishment.

Parade Pond Watford – full pond and filtration refurbishment. AGA carried out works to reinstall and make right the filter system that had been neglected, we also re-lined the pond using both EPDM rubber liner and a resin coating. Two gravel reed beds have also been constructed to help manage the ponds water quality.

0 Comments

River House – Uckfield – before and after pics of larch board edging and bank stabilisation.

River House – Uckfield – before and after pics of larch board edging and bank stabilisation.

0 Comments
Construction of a 400m2 reed bed for Anglia Salads is underway this week.
Engineering structures

Construction of a 400m2 reed bed for Anglia Salads is underway this week.

Construction of a 400m2 reed bed for Anglia Salads is underway this week. The guy’s aren’t letting the cold weather slow them down.
0 Comments

Watford Review

The Pond as it was before A.G.A. Group started work.

Image showing paraade pond before

The pond after A.G.A. Group’s stirling efforts, despite all that COVID 19 could throw at us!

Image showing Pond After

Watford Council

“The Watford Town Centre Pond has long since been a popular landmark of the Town.

In 2020, the Council engaged A.G.A. Group Enviro-Fix Limited to undertake a number of improvements to make the pond more environmentally friendly, and sustainable by introducing more natural ways to keep the water clean and healthy for the plants and wildlife that live there.

From the start of the project, A.G.A. acted professionally by firstly offering their expertise in the design of the wetlands and general structure of the pond, and secondly by constructing a team that displayed incredible knowledge of the project.

Like most town centre landmarks, the pond is located in an area of heavy footfall, and one of the main challenges faced by the Project Team was undertaking the works whilst ensuring the safety of the general public. A.G.A. discussed their proposals with the Council and mobilised the site with adequate signage and all necessary safety features. This was well received by the Project Team and the general public, who were kept informed as the project moved forward.

In spite of the project throwing up a number of technical challenges, A.G.A. acted swiftly and professionally to address unforeseen works by minimising the impact on the programme. They also introduced design features that will future-proof the project, and ensure the appearance and water quality remains consistent.

The project suffered from the impact of Covid-19, and again A.G.A. acted swiftly to adapt their working procedures and practices to meet government guidelines. They were able to deliver the works during difficult times, and still managed to complete the project in time for the reopening of the Town Centre.

As a Project Manager responsible for a variety of projects, I would have no hesitation in recommending A.G.A. to other clients, as their knowledge, professionalism and expertise will add value to any project.  ”  

Peter De-Bique BSc (Hons) MCIOB

Interim Building Surveyor (Projects)

Watford Borough Council

0 Comments

A great example of how wild flower seeding can not only enhance the habitat but be aesthetically pleasing.

A great example of how wild flower seeding can not only enhance the habitat but be aesthetically pleasing.

0 Comments

Finally!

Finally! We have completed a cemetery extension for Cheddar Parish Council. Was a battle with the weather at the end of last year but we now have levelled, seeded and planted ground.

0 Comments

Springfields Park – Hackney; A pump restoration we carried out earlier this year in a large park in Hackney.

Springfields Park – Hackney; A pump restoration we carried out earlier this year in a large park in Hackney. The pond was overgrown and full of silt, we installed coir roll revetments that we then backfilled with silt. We also installed a small beaches area with a timber revetment.

0 Comments

RipRap Rock bank installed at Hafan Y Mor holiday park.

RipRap Rock bank installed at Hafan Y Mor holiday park. The bank is constructed with 900mm boulders at the front to retain a rubble fill material that is then topped with 200-600mm rocks.

0 Comments

End of content

No more pages to load