Lake Construction Consultancy

  • Client:

    Nicholsons Nurseries

  • Project:

    Feasibility study

  • Location:

    South Newington, Oxfordshire

  • Duration:

    4 weeks

  • Project Coordinator:

    Ash Girdler

Background

The location of the proposed lake is situated within a field currently being used as a paddock and consists of short mown grass with a small area of wildflower meadow. The River Swere forms the southern and western boundary to the site and therefore needs to be considered as part of the construction of the new waterbody.

Wildlife-Survey-Environment-survey-Ecosystem-endagered-species-survey-4

Nicholsons Nurseries instructed AGA Group Consultancy to complete a feasibility study which included a desk-based assessment to establish the legal obligations that would need to be secured prior to designing and constructing a lake.

Trees in new cemetery area

The Work

The services AGA Group Consultancy provided to complete this survey included the following:

A desk-based assessment to consider the flood risk from the River Swere and the fact the proposed site is located within an area identified by the Environment Agency as Flood Zone 3. The assessment also considered the designated land. MAGIC and the National Biodiversity Network (NBN) Gateway was used to search for any possible ecological importance. It was concluded the proposed development would have no adverse impacts on protected sites, habitats and/or species.

The feasibility study required a topography survey. This involved noting the levels across the site where the proposed lake will be located. The purpose of this survey was to establish the existing levels and the finished levels post-excavation.

AGAGroup Consultancy provided the client with its legal obligations with regards to constructing a new water body. Additionally, AGA. Group Consultancy outlined the constraints and provided advice regarding different design options, lining options and habitat and landscaping. To conclude, a number of recommendations were given to the client to successfully secure permission to construct a new lake.

Years Established

Completed Projects

Operatives

Office Staff

Get a Quote For Your Project

Latest Case Studies

Aquatic-Engineering-landscaping-wildlife-surveys-fisheries-management-2

Creating A Hydro-Electric Generator Using Existing Waterways - Aquatic Engineering

Creating a hydroelectric waterway using existing structures. AGA was tasked with reinforcing and future-proofing this project so that the generator would produce power long into the future. A multiphased aquatic engineering project that bought together many divisions of the AGA group.

Aquatic-Engineering-landscaping-wildlife-surveys-fisheries-management-3

Soft & Hard Landscaping – Floating Boardwalk, Terrace and Wildlife Garden

This project was part of a scheme in Diss town centre, Norfolk, to improve public spaces and give more priority to pedestrians. AGA were awarded this contract by the Diss Heritage Triangle, on behalf of the Heritage Lottery Fund, to create public access through an unused piece of land.

Wildlife-Survey-Environment-survey-Ecosystem-endagered-species-survey

Ecological Survey - Environmental Consultancy & Project Management

Wendover Woods is owned and managed by the Forestry Commission and provide a range of formal and informal recreational activities. The woodland is approximately 325 hectares and contains a mosaic of broadleaf woodland dominated by Beech and conifer plantations largely consisting of Larch, Spruce and Fir.

Contact Us

6 + 8 =

AGA Headquarters

Merton Hall Ponds, Merton, Thetford IP25 6QH

Call AGA